Skip to main content

It’s what’s
inside
that
counts.

Fire-performance façade membranes, the layer behind the cladding.

Stamisol A1, Stamisol Safe One and Proshield®, from Don & Low Fire Solutions.

Look inside the wall
Brick tower with its cladding peeled back to reveal the membrane

Book a meeting at London Build

Stand G144, 25 to 26 Nov.

We will only use your details to arrange your meeting. See our privacy policy.

Look inside the wall

This is where the membrane sits in a typical ventilated façade.

  1. Cladding

    The outer finish

  2. Ventilated cavity

    Air gap behind the panels

  3. Membrane: Stamisol A1, Stamisol Safe One or Proshield®

    Helps keep wind-driven rain out of the wall. Classified A1, A2-s1,d0 or B-s1,d0 for reaction to fire to BS EN 13501-1.

  4. Insulation

    Keeps the heat in

  5. Structure

    The frame or wall everything fixes back to

For illustration only. Every façade build-up is different.

Our three membranes

Each one has a different fire classification and its own conditions of use.

Stamisol A1 on a façade

Euroclass A1, non-combustible

Stamisol A1

For applications requiring the highest reaction-to-fire classification.

View product
Stamisol Safe One on a façade

Euroclass A2-s1,d0, W1 water-tightness

Stamisol Safe One

High fire performance with W1 water penetration resistance for ventilated façades, including open joints up to 50 mm and 50% open area. UV resistance tested to 5,000 hours.

View product
Proshield® on a façade

Euroclass B-s1,d0, self-adhesive

Proshield®

Don & Low’s own self-adhesive membrane, with W1 water penetration resistance and an airtight, vapour-permeable layer.

View product
What A1, A2-s1,d0 and B-s1,d0 mean
Liam Blears on the Don & Low stand

Meet us at London Build

We are on stand G144 at ExCeL London on 25 and 26 November. Come and see Stamisol A1, Stamisol Safe One and Proshield®, and talk to Liam and the team. If you have a project on, bring the wall build-up and we will go through it with you.

Look out for our team in trench coats around the show, handing out The Don & Low Times.

Where
London Build, ExCeL London
When
25 to 26 November 2026
Stand
G144
On the stand
The Don & Low Times, a limited-edition T‑shirt, and the Fire Solutions team

Read The Don & Low Times

We have printed a newspaper for London Build. It covers the Stamisol launch, the full Don & Low construction range and our factory in Forfar.

If you missed it at the show, we can email you a copy.

Request the first edition

PDF, published for London Build.

The Don & Low Times

London Build edition · November 2026 · Forfar, UK

It’s what’s inside that counts

The materials concealed behind a building’s façade have a vital role to play in its fire performance.

Have we learned enough from the cladding crisis?Remediation is only half the story.

Protection starts behind the surfaceWhy external walls must be assessed as complete systems.

Talk to the Fire Solutions team

Tell us about your project and Liam’s team will get back to you.

Liam Blears

Head of Fire Solutions

We will only use your details to reply to you. See our privacy policy.